Faculty /facilities/taxonomy/term/39/all en Construction Starts: Wong CFI IF 2023 Brochure /facilities/channels/news/construction-starts-wong-cfi-if-2023-brochure-363888 <p>Please be advised that 9I制作厂免费 has mandated<b> </b>J.L Prist to carry out the following project: <b>23-034 - Wong CFI IF 2023 Brochure</b></p> <p><b>Description:聽</b>Renovation of rooms 2240, 2241, mainly around electrical and mechanical systems.</p> <p><b>Construction start date:聽</b>March17, 2025</p> <p><b>Planned construction end date</b>:聽July 18, 2025</p> <p><b>Work schedule:聽</b>Monday to Friday, 7:00 a.m. to 3 p.m. Works outside of building hours will be coordinated in advance.</p> Wed, 26 Feb 2025 16:18:34 +0000 roberta.grimmtrotta@mcgill.ca 1795 at /facilities Construction Starts: Lot 3 - Corrective Masonry Work on the Corner of the Staircase Wall (MNI Rockefeller Wing) /facilities/channels/news/construction-starts-lot-3-corrective-masonry-work-corner-staircase-wall-mni-rockefeller-wing-363822 <p>Please be advised that 9I制作厂免费 has mandated Atwill-Morin Ma莽onnerie (Groupe Atwill-Morin Inc.) to carry out the following project:聽<b>22-035 (B159) Lot 3 - Corrective masonry work on the corner of the staircase wall (MNI Rockefeller Wing)</b></p> <p><b>Description:聽</b>The purpose of the work is to make the structural and masonry fixes required at the corner of the staircase wall of the Rockefeller wing of the Montreal Neurology Institute for safety purposes. The Rockefeller wing was built in 1934 and is located on University Street in Montreal.</p> Mon, 24 Feb 2025 15:39:41 +0000 roberta.grimmtrotta@mcgill.ca 1793 at /facilities Construction Starts: Currie Gym - Replacement of the Multistack Chiller /facilities/channels/news/construction-starts-currie-gym-replacement-multistack-chiller-363560 <p>Please be advised that 9I制作厂免费 has mandated Plomberie Charbonneau to carry out the following project:聽<b>23-012 - Currie Gym - Replacement of the multistack chiller</b></p> <p><b>Description:聽</b>Installation of a new main chiller and its integration into the building control system.</p> <p><b>Construction start date:聽</b>February 17, 2025</p> <p><b>Planned construction end date</b>:聽May 30, 2025</p> <p><b>Work schedule:聽</b>Monday to Friday, 6:30 a.m. to 3 p.m. Works outside of building hours will be coordinated in advance.</p> Tue, 11 Feb 2025 19:33:10 +0000 roberta.grimmtrotta@mcgill.ca 1791 at /facilities Construction Starts: Parasitology Building 鈥 JELF Lu and Liu /facilities/channels/news/construction-starts-parasitology-building-jelf-lu-and-liu-363489 <p>Please be advised that 9I制作厂免费 has mandated CORENOV CONSTRUCTEURS to carry out the following project:聽<b>21-007 Parasitology Building 鈥 JELF Lu and Liu</b></p> <p><b>Description:聽</b>Renovation of lab P039 on the first floor of the Parasitology Building.</p> <p><b>Construction start date: </b>March 3<sup>rd</sup>, 2025</p> <p><b>Planned construction end date: </b>March 28<sup>th</sup>, 2025</p> <p><b>Work schedule:聽</b>Monday to Friday 6 a.m. to 3 p.m. Any additional hours will be coordinated.</p> Thu, 06 Feb 2025 20:49:18 +0000 roberta.grimmtrotta@mcgill.ca 1789 at /facilities Construction Starts: Life Sciences Complex - Shaft Reconstruction (Room 140) /facilities/channels/news/construction-starts-life-sciences-complex-shaft-reconstruction-room-140-362945 <p>Please be advised that 9I制作厂免费 has mandated 鈥淧riest Construction-脡lectricit茅鈥 to carry out the following project:聽<strong><i>14-140 Life Sciences Complex 鈥 Shaft Reconstruction at room 140 </i></strong></p> <p><b>Description:聽</b>The project involves reconstructing the wall of the mechanical shaft in Room 140 and painting one side of Corridor 1-HALL12.</p> <p><b>Construction start date:聽</b>January 27, 2025</p> <p><b>Planned construction end date:聽</b>February 21, 2025</p> Mon, 27 Jan 2025 19:57:41 +0000 roberta.grimmtrotta@mcgill.ca 1787 at /facilities Construction Starts: Raymond 鈥 JELF Dastmalchi (Lot 2) /facilities/channels/news/construction-starts-raymond-jelf-dastmalchi-lot-2-362292 <p>Please be advised that 9I制作厂免费 has mandated XO Construction Inc. to carry out the following project:聽<b>21-002 Raymond (Macdonald Campus) 鈥 JELF Dastmalchi (Lot 2)</b></p> <p><b>Description:聽</b>Renovation of room R1-038.</p> <p><b>Construction start date: </b>January 2025</p> <p><b>Planned construction end date: </b>July 2025</p> <p><b>Work schedule: </b>Monday to Friday, 6 a.m. to 3 p.m.</p> <p><b>Project Manager:聽</b><span class="spamspan"><span class="u">mark.ouimet</span> [at] <span class="d">mcgill.ca</span><span class="a"> (Mark Ouimet)</span></span></p> Mon, 23 Dec 2024 21:19:32 +0000 roberta.grimmtrotta@mcgill.ca 1785 at /facilities Construction Start: Pulp & Paper - JELF OCT 2022, Von Sperber /facilities/channels/news/construction-start-pulp-paper-jelf-oct-2022-von-sperber-360755 <p>Please be advised that FMAS Operations, Southeast Sector, will carry out the following project:聽<b>22-029 PULP & PAPER - JELF OCT 2022, Von Sperber </b></p> <p><b>Description:聽</b>To carry out electrical works between Lab 202 and existing electrical panel in 2-Hall1</p> <p><b>Construction start date:聽</b>November 4, 2024.</p> <p><b>Planned construction end date:聽</b>November 30, 2024</p> <p><b>Work schedule:聽</b>Monday to Friday, 6 a.m. to 3 p.m., on a part-time basis</p> Tue, 29 Oct 2024 13:52:34 +0000 roberta.grimmtrotta@mcgill.ca 1781 at /facilities Fall shoulder season /facilities/channels/news/fall-shoulder-season-359985 <p>We are entering a 6-week period referred to as the "fall shoulder season", which runs from end of September to early November. It is during this period that we switch from cooling our buildings to heating them.聽This transition does not affect the ventilation levels in the spaces, only the temperature<strong>.</strong></p> <p>Although the University is transitioning toward more flexible and adaptable systems, it remains difficult to maintain stable temperatures in some of our buildings at this time of the year, given the聽outdoor temperature fluctuations.</p> Wed, 25 Sep 2024 20:11:50 +0000 julie.c.fortier@mcgill.ca 1770 at /facilities Steam shutdown planned on downtown campus on Oct. 3 /facilities/channels/news/steam-shutdown-planned-downtown-campus-oct-3-359981 <p>A shutdown of steam distribution is planned on the downtown campus on the morning of <strong>Thursday, October 3, 2024, between 1 a.m. and 7 a.m.</strong> This shutdown is necessary for Facilities Management and Ancillary Services to replace pieces of equipment.聽</p> <p>This shutdown will affect all buildings on the downtown campus that rely on steam for:</p> <ul> <li>domestic hot water production,</li> <li>sterilization,</li> <li>humidification,</li> <li>and heating.</li> </ul> <p>The buildings that will be affected are:</p> Wed, 25 Sep 2024 17:44:41 +0000 julie.c.fortier@mcgill.ca 1768 at /facilities Construction Start: Wong 鈥 Mezzanine renovation /facilities/channels/news/construction-start-wong-mezzanine-renovation-359556 <p>Please be advised that 9I制作厂免费 has mandated Corenov Constructeurs to carry out the following project:聽<b>22-028 Wong 鈥 Mezzanine renovation</b></p> <p><b>Description:</b>聽Renovations to 3M055 and office 3M030 to create one new lab space.</p> <p><b>Construction start date:</b>聽September 2024</p> <p><b>Planned construction end date</b>: February 2025</p> <p><b>Work schedule</b>: Monday聽to Friday, 6 a.m. to 3 p.m. Work outside of building hours will be coordinated in advance.</p> Wed, 11 Sep 2024 21:42:00 +0000 julie.c.fortier@mcgill.ca 1766 at /facilities Construction start: MNI (Neuro) - CFI JELF room 254 renovation /facilities/channels/news/construction-start-mni-neuro-cfi-jelf-room-254-renovation-359540 <p>Please be advised that 9I制作厂免费 has mandated ISI Construction Inc. to carry out the following project:聽<b>23-117 MNI (Neuro) - CFI JELF room 254 renovation</b></p> <p><b>Description:</b>聽Renovation of room 254 (incl. new interior finishes, upgrade of electromechanical services) to accommodate research needs.</p> <p><b>Construction start date: </b>September 11, 2024</p> <p><b>Planned construction end date: </b>November 15, 2024</p> <p><b>Work schedule: </b>Monday to Friday, 7 a.m. to 3 p.m.</p> Wed, 11 Sep 2024 18:13:03 +0000 julie.c.fortier@mcgill.ca 1764 at /facilities Safety around construction sites /facilities/channels/news/safety-around-construction-sites-359313 <p><b>As construction activities continue on 9I制作厂免费 campuses and surrounding areas, here are a few safety instructions and tips:</b></p> Thu, 05 Sep 2024 13:15:10 +0000 julie.c.fortier@mcgill.ca 1760 at /facilities Construction start: Lyman Duff New Wing 鈥 Priority building envelope repairs /facilities/channels/news/construction-start-lyman-duff-new-wing-priority-building-envelope-repairs-359310 <p>Please be advised that 9I制作厂免费 has mandated Atwill-Morin Ma莽onnerie to carry out the following project:聽22-033 Lyman Duff New Wing (B169) 鈥 Priority building envelope repairs</p> <p><b>Description:聽</b>Repair/replacement of damaged bricks & wall at the back of the building, adjacent to tunnel between MNI and Duff, up to the delivery dock of the Lyman Duff Building.</p> <p><b>Construction start date:聽</b>September 3<sup>rd</sup>, 2024</p> <p><b>Planned construction end date:聽</b>November 30<sup>th</sup>, 2024</p> Thu, 05 Sep 2024 13:07:48 +0000 roberta.grimmtrotta@mcgill.ca 1759 at /facilities Construction Start: Strathcona Music - Renovation of Pollack Hall /facilities/channels/news/construction-start-strathcona-music-renovation-pollack-hall-356763 <p>Please be advised that 9I制作厂免费 has mandated Groupe Geyser to carry out the following project:聽19-167 Strathcona Music Building 鈥 Renovation of Pollack Hall聽</p> <p><strong>Description</strong>: The project consists of the renovation of Pollack Hall to enhance the user experience and improve accessibility.聽</p> <p><strong>Construction start date:</strong>聽May 2024聽</p> <p><strong>Planned construction end date:聽</strong>December 2025聽</p> Fri, 12 Apr 2024 19:02:55 +0000 nienke.broekstra@mcgill.ca 1712 at /facilities Construction start: Royal Victoria College (RVC) Residence - Masonry work /facilities/channels/news/construction-start-royal-victoria-college-rvc-residence-masonry-work-357755 <p>Please be advised that 9I制作厂免费 has mandated Atwill-Morin Ma莽onnerie to carry out the following project:聽22-036 (RVC Residence - B180) - Restoration of rendering on rear fa莽ades</p> <p><b>Description:聽</b>The project involves restoring the rendering on the rear fa莽ades of the Royal Victoria College (RVC), a student residence building, located on University Street.</p> <p><b>Construction start date: </b>July 2<sup>nd</sup>, 2024</p> <p><b>Planned construction end date</b>: End of October聽2024</p> Mon, 17 Jun 2024 21:43:13 +0000 roberta.grimmtrotta@mcgill.ca 1741 at /facilities